High chromium double-layer straight pipe
Request a Quote
Enter the quantity you need and add to your quote list for pricing inquiries.
Request a Quote
Enter the quantity you need and add to your quote list for pricing inquiries.
Specification
Name: Twin Pipe 5’’ * 5.5mm (2+3.5)
Weight: 53kg + – 2kg
| C | Si | Mn | S | P | Cr | Mo | V | Ni |
| 3.3-3.8 | 0.6-1.2 | 0.6-1.2 | ≤0.06 | ≤0.06 | 23-28 | 0.5-1.0 | 0.3-1.0 | 0.5-1.0 |
| Mechanical Properties | ||||||||
| Inner Hardness Thickest Part HRC | Outer Hardness Thickest Part HRC | Inner Hardness Port Part HRC | Outer Hardness Port Part HRC | |||||
| ≥63 | ≥63 | ≥63 | ≥63 | |||||
Working Life: 80000-100000CBM
Inner Wall Chemical Composition (Smelt Analysis) %
Outer Wall Chemical Composition (Smelt Analysis) %
| Chemical Composition (Smelt Analysis) % | ||||
| C | Si | Mn | P
Max. |
S
Max. |
| 0.12-0.24 | 0.20-0.55 | 1.20-1.60 | ≤0.045 | ≤0.045 |
| Mechanical Properties | ||||
| Tensile Strength
Mpa |
Yield Point
Mpa Min. |
Percentage Elongation
% Min. |
Burst Pressure
Bar |
Working Pressure
Bar Max. |
| 510-660 | 470 | 26 | 220 | 100 |
Specification
Name: Twin Pipe 5’’ * 8.0mm (3+5)
Weight: 73kg + – 2kg
Working Life: 80000-100000CBM
Inner Wall Chemical Composition (Smelt Analysis) %
| C | Si | Mn | S | P | Cr | Mo | V | Ni |
| 3.3-3.8 | 0.6-1.2 | 0.6-1.2 | ≤0.06 | ≤0.06 | 23-28 | 0.5-1.0 | 0.3-1.0 | 0.5-1.0 |
| Mechanical Properties | ||||||||
| Inner Hardness Thickest Part HRC | Outer Hardness Thickest Part HRC | Inner Hardness Port Part HRC | Outer Hardness Port Part HRC | |||||
| ≥63 | ≥63 | ≥63 | ≥63 | |||||
Outer Wall Chemical Composition (Smelt Analysis) %
| Chemical Composition (Smelt Analysis) % | ||||
| C | Si | Mn | P
Max. |
S
Max. |
| 0.12-0.24 | 0.20-0.55 | 1.20-1.60 | ≤0.045 | ≤0.045 |
| Mechanical Properties | ||||
| Tensile Strength
Mpa |
Yield Point
Mpa Min. |
Percentage Elongation
% Min. |
Burst Pressure
Bar |
Working Pressure
Bar Max. |
| 550-720 | 490 | 27 | 260 | 130 |
Concrete pump straight pipes are essential components for efficient and reliable concrete delivery in construction projects. Made from durable materials, they ensure smooth flow and minimize wear during pumping.
Enter your order quantity to get an instant estimate of production and shipping time.
Estimated total lead time–~–
This estimate is for reference only and does not constitute a contractual commitment. Actual lead time depends on order details, material availability, production schedule, customs clearance and carrier capacity. Please contact us for a confirmed delivery date.
| Product | Qty |
|---|
| Product | Qty |
|---|